Projects
Steel Part Design & Testing — Daniels Manufacturing Corporation
CAD 3D/2D • GD&T (ASME Y14.5) • FMEA
Designed a critical steel component concept-to-creation with 3D models and 2D drawings complete with GD&T per ASME Y14.5
Ran CAD-based stress analysis and applied FMEA to find failure points, improving reliability by ~30%
Partnered with R&D and manufacturing to preemptively solve design-to-production challenges
CAD Build & Project Management — TKE Advisor Board, Inc.
AutoCAD Inventor • DFA • Structural Modeling • Team Leadership • Gantt Planning
Modeled a large-scale, $2,000 covered patio system; performed shear/strain calculations and materials research
Led a 10-person construction team and used Gantt charts to meet schedule and budget constraints
Analyzed cost-performance trade-offs to deliver satisfactory results to the customer
Wind Flow Simulation — Burnett Honors College
ANSYS • CFD • Mesh Analysis • Engineering Reporting
Simulated internal flow through a tunnel, analyzing changes in velocity profiles and pressure gradients
Applied structured meshing to ensure simulation stability and output and interpreted data to support design improvement for embedded structures
Load-Bearing Wall Construction — Catalyst Surf Shop
Load Analysis • Budgeting • Client Collaboration • Real-World Constraint Engineering
Drafted construction plans and managed a $1,000 budget with tight materials and schedule limitations
Coordinated directly with the customer to meet functional and aesthetic requirements
Full Mechanical & Electrical System Development – GNOR Project
Electromechanical Integration • Closed Loop Controls • Testing & Validation • Fabrication
Engineered closed-loop heading control using gyroscope feedback to re-orient after disturbances and verified electronics as a system before hull integration
Collaborated on CAD modeling of the hull and mechanical assemblies in Onshape, ensuring dimensional accuracy for motor mounts, rudder linkage, and electronics bay
Indoor Bar Project — TKE Advisor Board, Inc.
AutoCAD Fusion • 2D CAD Drafting • Cradle to Grave Project Management • Technical Documentation
Created 2D CAD production drawings and delivered technical documentation to customer to ensure ease of assembly and construction
Produced drawing sets , material lists , and risk-mitigation strategies to ensure optimal product lifecycle
Autonomous Maze Robot — Burnett Honors College
C+ • CAD • 3D Printing •Control Systems
Utilized C+ and Arduino systems to engineer a maze-navigating robot with a sensor-triggered catapult
Modeled 3D printed catapult using 3D CAD for optimal performance
Cantilever Beam Analysis — Design and Analysis of Machine Components UCF
ANSYS APDL • Structural Mechanics • Simulation & Analytical Validation
Simulated maximum stress and maximum deflection in ANSYS APDL using material properties.
Validated simulation by comparing against closed-form beam theory and calculated % error.
Delivered full report and simulation video walkthrough, demonstrating analysis workflow and results.
✕